You can find latest information on the road conditions of Lahaul, Spiti and Sach Pass (Pangi Valley) in 2019. We will also keep this thread update with the news of tentative opening dates of Rohtang Pass, Kunzum La, Chandertal and Sach Pass. So make sure to subscribe to this thread for regular updates.

Shimla – Kaza (Spiti Valley) Road Status: Open, with heavy snow accumulation on the road.

Manali - Kaza Road Status ( via Rohtang and Kunzum): Open, but in bad state.

Manali - Lahaul Road Status: Open

Chandertal Road Status: Open

Rohtang Pass Road Status: Open

Sach Pass Road Status (Pangi Valley): Open, but in bad state.

Permit for Rohtang Pass:
Online permit registration for going beyond Rohtang Pass is now open and can be done from the following link, Tourism Development Council Manali (H.P.)-InformatoryScreen. The permit would only be issued to vehicles which are less than 10 years old and this permit isn’t for people who are just going to up to Rohtang Pass (if you return from Rohtang, your vehicle will be blacklisted.)
Hi Yoyesh, planning Sachpass during the 19th to 21st July weekend, any suggestions ? Thanks
 

samrohi

New Member
Came back last night after a grueling 12 hour ride from Kalpa! Crazy downpour Solan onward till Panchkula. And yeah you will find showers near Rampur Bushair and Shalkar; it surprisingly drizzled at Hikkim as well when I was there. Very unpredictable weather, don't follow google really!
769716
 

adsatinder

explorer
Apple Gardens And Bridge Ruined In Flood In Kinnaur Himachal
Sangla, Kinnaur

नाले में अचानक बाढ़ आने से सेब के बगीचे तबाह, पुल क्षतिग्रस्त, कई मकानों को खाली करने के आदेश

न्यूज डेस्क, अमर उजाला, सांगला(किन्नौर), Updated Mon, 22 Jul 2019 08:35 PM IST



apple Gardens and bridge ruined in flood in kinnaur himachal

1 of 5
- फोटो : अमर उजाला

हिमाचल के किन्नौर जिले में खरोगला नाला में अचानक पानी का स्तर बढ़ने से बाढ़ आ गई। बाढ़ ने रक्षम और बटसेरी गांव के ग्रामीणों के सेब बगीचों को अपनी चपेट में ले लिया है।



2 of 5
- फोटो : अमर उजाला

वन विभाग का पैदल पुल बह गया है। वहीं, कई पौधों की नर्सरी तबाह होने से वन विभाग को 50 लाख का नुकसान हुआ है।
प्राप्त जानकारी के अनुसार खरोगला नाला में लगातार पानी बढ़ने से रक्षम, छितकुल लिंक मार्ग पर बना पुल भी खतरे की जद में है।
इस पुल के ढह जाने से रक्षम पंचायत और छितकुल पंचायत का संपर्क मार्ग कभी भी कट सकता है।




3 of 5
- फोटो : अमर उजाला

खरोगला नाला में बाढ़ आने से सूरज सिंह नेगी, इंद्र भगत नेगी, मुकेश नेगी, दामोदर नेगी, गोपाल नेगी, मनोज लोकटस, तुलसी राम नेगी, प्रताप सिंह नेगी, देवराज नेगी, राकेश लोकटस, ठाकुर सिंह लोकटस, सनम छोपले, चतरू राम, पदम सिंहए, शिव, प्यारे लाल, पदम राम और रक्षम में जय प्रकाश नेगी सहित नरेश नेगी का बगीचा बाढ़ की चपेट में आया है।


4 of 5
- फोटो : अमर उजाला

बाढ़ आने की सूचना मिलने के बाद हिमाचल वन निगम उपाध्यक्ष सूरत नेगी ने खरोगला नाला का निरीक्षण किया और बाढ़ प्रभावित लोगों से मिले। उन्होंने बटसेरी, चिस्पान, खरोगला और रक्षम के लोगों को जल्द मुआवजा देने का आश्वासन दिया है।


5 of 5
- फोटो : अमर उजाला


सांगला के तहसीलदार विक्रमजीत सिंह ने बताया कि बाढ़ आने से बासपा नदी के आसपास रहने वाले लोगों को मकान खाली करने के निर्देश प्रशासन ने दिए हैं।


नाले में अचानक बाढ़ आने से सेब के बगीचे तबाह, पुल क्षतिग्रस्त, कई मकानों को खाली करने के आदेश
 

adsatinder

explorer
Hundreds stranded after massive landslide blocks Shimla-Kinnaur highway

Posted at: Jul 22, 2019, 11:32 AM; last updated: Jul 22, 2019, 10:59 PM (IST)

Hundreds stranded after massive landslide blocks Shimla-Kinnaur highway


A massive rock slid occurred due to heavy rains on National Highway-5 near Bhawanagar in Kinnaur. Tribune photo

Kuldeep Chauhan
Tribune News Service
Shimla, July 22


The traffic on the Hindustan-Tibet highway near Bhawanagar in Kinnaur has come to a halt for the last over 20 hours following a massive landslide, which was triggered by heavy rain.
The landslide occurred near Bhawanagar when over 10 huge boulders fell on the road.
Hundreds of vehicles are stranded on either side of the road and basic commodities did not reach Kinnaur.
The National Highway engineers and the local administration have blasted some five big rocks, and are trying to break the rest to clear the road.


Hundreds stranded after massive landslide blocks Shimla-Kinnaur highway
 

adsatinder

explorer
Theog-Hatkoti NH widening endangers apple orchards
Posted at: Jul 22, 2019, 7:33 AM; last updated: Jul 22, 2019, 7:33 AM (IST)
No protection wall work started before monsoon; funds remain unused

Theog-Hatkoti NH widening endangers apple orchards



Bhanu P Lohumi

Tribune News Service

Shimla, July 21


Apple orchardists of Domehar and Jaltahar villages along the Theog-Hatkoti National Highway (No 705) are living on the edge as their orchards are facing threat of extinction due to apathy of the National Highway wing of the Public Works Department, which had failed to start restoration works before the onset of monsoon in spite of repeated reminders.
Construction of the retaining walls and breast walls in the sliding area was required immediately as the stretch has become highly prone to landslides due to widening of the road. The orchards have developed fissures as the restoration of roads damaged during winters is yet to commence while monsoon is active in the state, says Aman Chauhan, a local.
The affected orchardists are running from pillar to post to get the work started. Despite that Rs 2.37 crore were sanctioned in April this year for construction of retaining and breast walls, works have not started yet. As many as 19 letters have been exchanged between the government departments and the farmers since February 2019 till date.

“This national highway is the lifeline of apple growers but frequent landslides due to inadequate protective walls are damaging the orchards and polluting the Giri river water as entire mud is flowing into the river. All this is happening due to sub-standard works done by contractors”, said retired engineer RL Justa, resident of affected village, who has lurking fear in his mind that heavy rains can spell doom for his orchard.
Most of the retaining walls and breast walls constructed last year have collapsed and restoration works are yet to commence. The threat to orchards was increasing with each passing day. It is unfortunate that even after the residents meeting Additional Chief Secretary (Public works) thrice and Engineer-in-chief twice and other concerned officers, the works have not been awarded.
Raising questions over the functioning of the NH wing, Justa demanded probe into the functioning of the NH wing and said that both the companies did not complete the work. The unfinished and tardy work has become the bane of affected people.
“During the month of April, the work was not started as the model code of conduct was in force. Now we are awaiting implementation of directions given by the ACS to the NH wing on April 12, 2019 to award the works within 15 days”, he said.

AN orchard along the highway.
Construction of retaining walls and breast walls in the sliding area was required immediately as the stretch has become highly prone to landslides due to widening of the road. The orchards have developed fissures as the restoration of roads damaged during winters is yet to commence while monsoon is active in the state. — Aman Chauhan, a local resident



Theog-Hatkoti NH widening endangers apple orchards
 

adsatinder

explorer
HomeHimachal PradeshShimla › Heavy Rainfall Warning For Two Days In Himachal
हिमाचल में दो दिन भारी बारिश की चेतावनी, इन जिलों में बरसेंगे बादल
न्यूज डेस्क, अमर उजाला, शिमला Updated Mon, 22 Jul 2019 03:49 PM IST

heavy rainfall warning for two days in himachal

- फोटो : अमर उजाला


मौसम विज्ञान केंद्र शिमला ने हिमाचल में दो दिन भारी बारिश की चेतावनी जारी की है। विभाग के ताजा पूर्वानुमान के मुताबिक राज्य में 25 और 26 जुलाई को भारी बारिश होगी।
विज्ञापन


प्रदेश में 28 जुलाई तक मौसम खराब बना रहेगा। सोमवार को प्रदेश में मौसम मिलाजुला बना रहा। राजधानी शिमला में दिन भर बादल छाए रहे। दिन के समय हल्की बूंदाबांदी भी हुई।

जिला मुख्यालय धर्मशाला में दोपहर बाद हल्की बारिश हुई, जबकि जिला के अन्य क्षेत्रों में बादल तो छाए रहे, लेकिन बारिश नहीं हुई। सोमवार को अधिकांश क्षेत्रों में मौसम साफ रहने से अधिकतम तापमान में दो से तीन डिग्री की बढ़ोतरी दर्ज हुई।

सोमवार को ऊना में अधिकतम तापमान 36.0, सुंदरनगर-भुंतर में 33.0, चंबा में 31.9, कांगड़ा में 31.7, नाहन में 31.1, सोलन में 30.5, धर्मशाला में 28.8, शिमला में 25.2, कल्पा में 24.8, केलांग में 21.0 और डलहौजी में 19.8 डिग्री सेल्सियस दर्ज हुआ।


हिमाचल में दो दिन भारी बारिश की चेतावनी, इन जिलों में बरसेंगे बादल
 
Guys, just completed the sach pass circuit. The route we took and the road conditions for members is as follows (we left on 19th and came back 23rd July and were the only tourists in and around Sach pass at that time). We were also lucky as we didn't get any rains in the entire trip. The car we took was a Tata Safari Storme 4X2

1. Day 1 Delhi to Bairagarg via Dalhousie (around 650 kms) - good roads till Dalhousie and pathetic near Bairagarh. Stayed at hotel Chamunda and took 13 hours to reach from Delhi

Day 2 Bairagarg to sach pass 31 kms in 2.5 hours - roads disappear after Satrundi check post and a lot of snow before and after Sach pass

Sach pass to Killar 40 kms - severely potholed roads

Killar to Udaipir 75 kms very bad roads with no good patch anywhere

Udaipur to Keylong 54 kms - decent roads all the way with some exceptions. We stopped at Keylong on day 2 and stayed at Atithi guest house

Total time taken from Bairagarh to Keylong 13 hours to cover appx 200 kms

Day 3 Keylong to Manali via Rohtang Pass 120 kms. Roads just before and after the pass are in a mess.

Day 4 rest at Manali

Day 5 Manali to Delhi in appx 12.5 hours good roads most of the way including Bilaspur. Some road works happening here and there but overall fine
 

adsatinder

explorer
Guys, just completed the sach pass circuit. The route we took and the road conditions for members is as follows (we left on 19th and came back 23rd July and were the only tourists in and around Sach pass at that time). We were also lucky as we didn't get any rains in the entire trip. The car we took was a Tata Safari Storme 4X2

1. Day 1 Delhi to Bairagarg via Dalhousie (around 650 kms) - good roads till Dalhousie and pathetic near Bairagarh. Stayed at hotel Chamunda and took 13 hours to reach from Delhi

Day 2 Bairagarg to sach pass 31 kms in 2.5 hours - roads disappear after Satrundi check post and a lot of snow before and after Sach pass

Sach pass to Killar 40 kms - severely potholed roads

Killar to Udaipir 75 kms very bad roads with no good patch anywhere

Udaipur to Keylong 54 kms - decent roads all the way with some exceptions. We stopped at Keylong on day 2 and stayed at Atithi guest house

Total time taken from Bairagarh to Keylong 13 hours to cover appx 200 kms

Day 3 Keylong to Manali via Rohtang Pass 120 kms. Roads just before and after the pass are in a mess.

Day 4 rest at Manali

Day 5 Manali to Delhi in appx 12.5 hours good roads most of the way including Bilaspur. Some road works happening here and there but overall fine
Great Storme !
Great Trip !
 
Top